In general, a reinforced concrete structural system is adopted throughout the building. The tower columns in the basement structure are arranged in a way to facilitate the proposed parking layout, driveway and ramp arrangement and while considering the spans at Transfer structure. And, the Transfer Structure is conceptualize based on typical shear wall arrangement as per architectural design intent.

project details

  • Client : Morphogenesis
  • Year of Design/Const : 2023 - Ongoing
  • Development Area : 12.01  Million/SQ.FT
  • No of Floors : 3B+GF+33 = 33 Slabs
  • Project Status : Under Construction
  • Scope of Work : Peer Review
  • Project Location : LB Nagar, Hyderabad