The proposed residential development located in Narsingi, Hyderabad, encompasses 4-levels of basement car park, Ground floor (ST-01) and Walking Track (ST-02). The typical residential units begins from L1 till L42, this arrangement of floor result in to (4B+ST01+ST02+42+TERR = 48 suspended slabs).

This proposed developed is covered over a built up area is 22, 93,190SqFt. The two residential Towers A & B are within a common basement structure measuring a width of 71.5/91m X 175m. The residential towers A & B are of similar height of 140.5m above ground floor (ST-01) to cover 42-floors above transfer slab (L01). The proposed twin towers are positioned 18.0 meter apart. The club house structure adjacent to Tower-B is separated with an introduction of expansion joint (EJ).

In general, a reinforced concrete structural system is adopted throughout the building. The tower columns and basement structure are arranged in a way to facilitate the proposed parking layout, driveway and ramp arrangement.

Typically the basement columns are arranged at span of 8.0-8.5 meter to accommodate 3-carparking per bay. In general it forms a grid of 8.0X8.5, therefore flat slab (225) thick with column capital is adopted to facilitate services passing underneath slab soffit, except at areas of water tanks. The water tanks and septic tanks are arranged at Basement-1.

project details

  • Client : Lansum Group, Hyderabad
  • Year of Design/Const : 2019 - Ongoing
  • Development Area : 2.36  Million/SQ.FT
  • No of Floors : 4B+GF+STI+P1+42+ = 48 Slabs
  • Architect : Genesis Planners, Hyderabad
  • Scope of Work : Leading Structural Design
  • Project Status : Under Construction
  • Project Location : Narsingi, Hyderabad