In general, a reinforced concrete structural system is adopted throughout the building. The tower columns in the basement structure are arranged in a way to facilitate the proposed parking layout, driveway and ramp arrangement and while considering the spans at Transfer structure. And, the Transfer Structure is conceptualize based on typical shear wall arrangement as per architectural design intent.

project details

  • Client : ARK Group
  • Year of Design/Const : 2022 - Ongoing
  • Development Area : 0.35  Million/SQ.FT
  • No of Floors : 1B+GF+8 = 8 Slabs
  • Architect : Genesis Planners
  • Scope of Work : Leading Structural Design
  • Project Status : Under Construction
  • Project Location : Channasandra, Bengaluru