{"id":579,"date":"2023-08-02T11:32:27","date_gmt":"2023-08-02T11:32:27","guid":{"rendered":"https:\/\/arsaengineers.com\/?post_type=project&p=579"},"modified":"2023-10-04T10:56:08","modified_gmt":"2023-10-04T10:56:08","slug":"bearys-welfare-associations","status":"publish","type":"project","link":"https:\/\/arsaengineers.com\/hospitality\/bearys-welfare-associations\/","title":{"rendered":"Beary’s Welfare Associations"},"content":{"rendered":"\n

The proposed public building for Beary\u2019s community is developed based on 2B+GF+4 typical floors. There are two levels of basement car park and a showroom at ground floor level. The level 1 & 2 are convention center with hall width measuring 17 meter (55\u2019) spans.<\/p>\n\n\n\n

The post tensioned (PT) beam spanning 17m for the above convention halls are designed to meet architectural design intent. The levels 3,4 &5 are designed for guest rooms.<\/p>\n","protected":false},"excerpt":{"rendered":"

The proposed public building for Beary\u2019s community is developed based on 2B+GF+4 typical floors. There are two levels of basement car park and a showroom at ground floor level. The level 1 & 2 are convention center with hall width measuring 17 meter (55\u2019) spans. The post tensioned (PT) beam spanning 17m for the above […]<\/p>\n","protected":false},"author":2,"featured_media":0,"template":"","meta":{"footnotes":""},"project-category":[14],"project-location":[],"project-tag":[],"acf":[],"_links":{"self":[{"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/project\/579"}],"collection":[{"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":11,"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/project\/579\/revisions"}],"predecessor-version":[{"id":2078,"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/project\/579\/revisions\/2078"}],"wp:attachment":[{"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/media?parent=579"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/project-category?post=579"},{"taxonomy":"project-location","embeddable":true,"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/project-location?post=579"},{"taxonomy":"project-tag","embeddable":true,"href":"https:\/\/arsaengineers.com\/wp-json\/wp\/v2\/project-tag?post=579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}